Amtrak was founded in 1971 through the government-sponsored consolidation of most of the then current passenger rail companies in the United States.Ĭontinuing the tour of fast trains for the public, let’s take a stop at Japan. It is operated and managed as a for-profit corporation. The National Railroad Passenger Corporation, doing business as Amtrak, is a partially government-funded American passenger railroad service. Sections have different owners including the Commonwealth of Massachusetts, Connecticut Department of Transportation, Metro-North Railroad and Amtrak. Built between 18, it is operated by Amtrak. covers 452 miles at top rates that vary from 110 to 125 mph, depending on location. In contrast, Amtrak, running the Northeast Corridor from Boston to Washington DC. As the lines continue and proof of revenue is shown, private sector financing will be encouraged. Cap and Trade funds are also available as needed, upon appropriation, as a backstop against federal and local support to complete the IOS. The remaining portions of the IOS will be funded using state bonds, federal support, and local funds. This amounts to an estimated $44.8 million per mile. Developing the first segment of the Initial Operating Section (IOS) from Madera to Bakersfield will cost $6 billion, consisting of $3.3 billion in federal funding and $2.6 billion in Proposition 1A bond proceeds. These funds will be available to the California High-Speed Rail Authority (Authority) at different times based on the development timeline of the system. The LA to Anaheim link (31 miles) will have a top speed of 90 mph, and San Jose to San Francisco (57 miles) about 110 mph.Ĭapital funding to develop the high-speed rail project will come from federal, state, local and private sources. Speed on the HSR system will average about 220 miles an hour on the 422 mile link, about 2 hours, between San Jose and Los Angeles. The Phase 2 route will extend from the Central Valley north to Sacramento, and from Los Angeles east through the Inland Empire and then south to San Diego. Phase 1 construction will be about 520 miles long, and is planned to be completed in 2029, connecting San Francisco, Los Angeles, and Anaheim using high-speed rail through the Central Valley. The initial Merced-Bakersfield link will end in 2019. The planned network of rail will extend down to San Diego along the coast and will have spurs running east to the Central Valley. The California High Speed Rail (HSR) system will be over 800 miles long. This transit, so far, is privately funded. A fully developed Hyperloop system would run between Los Angeles and San Francisco in 30 minutes. The Hyperloop has the theoretical capacity to travel 760 miles per hour. Quay Valley, a new town in planning phase, is located near Interstate 5 between Bakersfield and Fresno. The Phase 1 Plan was submitted to the California state legislature on May 2, 2016.īut if you aren’t in California and are only picking up occasional news, it is easy to get this high speed rail project confused with the “ Hyperloop” project touted by Elon Musk.Ī Hyperloop track proposed by Hyperloop Transportation Technologies, is seeking construction permits in Quay Valley, California to run a five mile track. or not.Īs Jeff Morales, CEO, California High Speed Rail Authority, recently said at the CityAge SF conference, “$3 billion in investment so far and people still deny it is happening!” He’s referring to the construction on the initial section of the planned California High Speed Rail, from Merced to Bakersfield, which began in 2015 and expected to end in 2019. Lucky California! They get the High Speed Rail AND the Hyperloop “bullet train” too! ….
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |